Objectives and purpose

Acting as the Independent Connections Provider (ICP) for the 15MW Lockleaze Fast Frequency Response (FFR) facility in Bristol, Smith Brothers was enlisted by contractor Metka-EGN to carry out the high voltage electrical connections and substation construction on the UK’s largest standalone battery storage site.