Parsonage Wood 5MW Solar Farm

Western Power Distribution (WPD) August 2016 to November 2017

To complete a 7.5 kilometer private wire 33kV connection from North-moor 132kV Primary. The cable route is through mainly unmade land, with three horizontal directional drills: 1 x Main A road, 2 x water courses. Smith brothers have installed a 33kV 240mm core NKT AXAL cable, with around 19 specially made Smith Brothers approved cable joint. Smith Brothers commissioned the 33kv primary ABB ZX.02 board.

_dsc0494 _dsc0533 1 3
NERSUVDBISO 9001ISO 14001ISO 45001ConstructionlineCHASUVDBRoSPASupply Chain Sustainability School
Download Brochure | Call Us