Smith Brothers were employed by Canadian Solar to undertake the Construction of a U.K. Power Networks Specification Containerised 33kV substation and associated Grid connection trenching and cabling for a 4MW Solar Farm.
The contract covered the following scope of works:
Design, supply and installation of the U.K. Power Networks specification below ground reinforced concrete foundation for the Containerised housing.