Objectives and purpose
Smith Brothers Contracting was appointed to complete all contestable works for the 7 MVA Photovoltaics (PV) generation project. The scope of works included a 33kV tee-off connection into the existing Scottish & Southern Energy (SSE) Shripney – Bilsham overhead line circuit.