Commercial & Industrial Sectors

LV Switchgear Okken

Flexible and cost-effective commercial and industrial electrical infrastructures without having to rely on the DNO

When a development is underway to make way for a new or expanding commercial or industrial facility, timing is everything. Delays to project scheduling can prove extremely costly, which is why we pride ourselves on providing extremely responsive support to clients in this sector.

Smith Brothers offers a quicker, more flexible and cost-effective electrical infrastructure without having to rely on the DNO. Our experienced electrical engineers specialise in both low and high voltage distribution systems, and we can provide all relevant services in house, without the need for subcontracting.

Our services

Having worked on hundreds of commercial and industrial power projects throughout the UK, Ireland and overseas, we offer the full suite of electrical infrastructure services, including:

UPS

Because of the breadth of our expertise we are also able to take care of an entire project from start to finish, with one of our cost-effective, all-inclusive turnkey packages.

If you’re currently planning a new commercial or industrial project, or you require more power to your site, contact our team of specialist electrical engineers to discuss your requirements in more detail. Please call 0333 358 3653 or email enquiries@smithbrothersltd.co.uk to outline your needs.

Commercial & Industrial
Latest Project

Bradley Park Community Centre

Objectives and purpose Smith Brothers was approached by Friends of Bradley Park to help with the activation of a brand-new community hub, after the relationship with the incumbent provider failed. The Elland-based contractor delivered technical assistance through cable calculations and cable route design as well as resources and expertise to assemble the power supply. This involved the building of a new plinth to site the metering kiosk, as well as excavation and preparation works to lay 100 metres of 3c95 copper cable. Other electrical works included jointing, installing a single-phase connection, removing the condemned supply and reconnecting a temporary supply to provide power and lighting whilst snagging works were being carried out.

Bradley Park Community Centre Laptop
NERSUVDBISO 9001ISO 14001ISO 45001ConstructionlineCHAS
Download Brochure | Call Us